top of page

Site Compatability Audits & Troubleshooting Services

flavio-anibal-tR22HABL3VE-unsplash.jpg

Case Study

Interoperability Audit at Multi-Operator Coal Facility

Challenge

Treatment program designed for one permit area caused conflicts in another due to incompatible drainage characteristics.

ENG Solution

A comprehensive site audit was conducted. Flow modeling revealed interference between flocculants and pH stabilization agents. ENG redesigned chemical deployment to reflect differing geology and effluent chemistry across the site.

Results

  • Cross-contamination incidents eliminated

  • Reduced double-dosing practices by 70%

  • Improved compliance in all zones with site-wide compatibility

  • Clarified SOPs for each operator group

bottom of page