Thickener and Settling Efficiency Revamp at Coal Prep Plant
Challenge
Thickeners underperforming, high polymer usage, excessive underflow dilution, and multiple downstream pump issues.
ENG Solution
After a 2-week audit, ENG redesigned the chemical addition points, introduced staged flow redirection, and modified the delivery polymer program. A new rake drive torque monitoring system was recommended and installed by client, and the sludge pumping schedule was optimized and integrated into the process DLC.
Results
-
Polymer dosage reduced by 35%
-
Underflow solids improved from 19% to 24%
-
Pump reliability improved, reduced pressures on slurry line
-
ROI realized within 7 months