Process Optimization &
Performance Improvement

cs2.jpeg

Case Study

Thickener and Settling Efficiency Revamp at Coal Prep Plant

Challenge

Thickeners underperforming, high polymer usage, excessive underflow dilution, and multiple downstream pump issues.

ENG Solution

After a 2-week audit, ENG redesigned the chemical addition points, introduced staged flow redirection, and modified the delivery polymer program. A new rake drive torque monitoring system was recommended and installed by client, and the sludge pumping schedule was optimized and integrated into the process DLC.

Results

  • Polymer dosage reduced by 35%

  • Underflow solids improved from 19% to 24%

  • Pump reliability improved, reduced pressures on slurry line

  • ROI realized within 7 months