Material Handling & Product Quality Enhancement

Case Study
Final Product Flowability Improvement at Frac Sand Plant
Challenge
Final product exhibited poor flowability in railcars due to residual moisture. This led to customer complaints and transport delays.
ENG Solution
ENG conducted lab testing on particle size distribution and moisture retention. A low-dose hydrophobic treatment was integrated into the final rinse process. Modifications were also made to the stacker drop height to minimize particle breakage.
Results
-
Moisture content reduced from 8.2% to 5.5%
-
No reported flowability issues in 60 days post-implementation
-
20% faster unloading time, operator improved handling of containers