Dosing Optimization at Titanium Dioxide Refinery
Challenge
Erratic dosing pumps and inconsistent floc formation were affecting water clarity and downstream filter press performance
ENG Solution
ENG installed new metering pumps, fine-tuned polymer type and molecular weight, and integrated a control panel with adjustable feedback loops. In-field jar testing was paired with inline dose monitoring during initial weeks.
Results
-
Clarifier turbidity improved from 67 NTU to 8 NTU
-
Filter press cycle times reduced by 22%
-
Program cost savings: $3,200/month
-
Operator training improved consistency and reduced overuse